Nuclear Power Solutions

Negative Void-Reactivity Fuel Bundle for CANDU
Conceptual Design and confirmation of large negative reactivity at coolant void, by MCNP Simulation completed.
Target for in-reactor testing and demonstration irradiation: December 2028.
Target for operation licensing in existing CANDU reactors:
December 2030. The use of Negative Void-Reactivity Fuel Bundle in CANDU reactors would allow reactor full power up-rating by at least 7%, with lower risk and similar fuel cost.
Small Modular Reactor for Urban Operation
We plan to offer by the end of this decade a new generation of Small Modular Reactor using Natural Uranium Fuel for Urban Operation which will be the safest reactor ever designed. The Leverage Unit Energy Price price target is at most 95% of inland wind power, including generous allowance for nuclear waste disposition.